服务号

订阅号

Manuscript details

Current location:Home >Manuscript details

Grid Peak⁃shaving Study Considering Electrolytic Hydrogen Production Segmentation Capacity and Equivalent Load Disaggregation in Multi⁃time Scale

Release date:2025-01-20  Number of views:237   Amount of downloads:175   DOI:10.19457/j.1001-2095.dqcd25472

      Abstract:New energy has obvious volatility and anti-peak-shaving characteristics,and the integration of largescale new energy into the power grid poses challenges to the peak-shaving. Hydrogen energy has a good potential for application as a potential peak-shaving resource. A multi-time scale peak-shaving scheduling model based on electrolytic hydrogen production was proposed with the aim of solving this problem. Firstly,the evaluation index model of peak-shaving capacity of electrolytic hydrogen was introduced and different types of electrolytic hydrogen peaking capacity were caculated. Meanwhile,an equivalent load disaggregation model based on coordinate distance minimization and wavelet transform techniques was constructed for matching different equivalent load components with different electrolytic hydrogen production systems. Subsequently,a multi-time scale peak-shaving scheduling scheme for different load components was proposed with the objective of improving the economics and effectiveness of peak-shaving. Finally,the validity of the proposed model was confirmed through simulations on the IEEE-30 node system.


      Key words:electrolytic hydrogen production;load disaggregation;peak-shaving;multi-time scale




Copyright Tianjin Electric Research Institute Co., Ltd Jin ICP Bei No. 07001287 Powered by Handynasty

Online illegal and bad information reporting hotline (Hedong District):022-84376127
Report Mailbox:wangzheng@tried.com.cn