Manuscript details
Current location:Home >Manuscript details
Release date:2024-01-18 Number of views:436 Amount of downloads:354 DOI:10.19457/j.1001-2095.dqcd24461
Abstract: With the large increase of load users,the load side adjustable resources gradually increase,and the
load side demand response(DR)resources are used to participate in microgrid scheduling to improve the level of
new energy consumption. In order to give full play to the scheduling potential of DR resources and optimize the
user side load management capability,a multi-time scale optimal scheduling strategy for microgrids that takes into
account scheduling priorities was proposed. Firstly,according to the response characteristics of different DR
resources,the price-based demand response(PDR)resources and incentive-based demand response(IDR)resources were subdivided into five types,and a DR model was constructed to match the scheduling period. Secondly,the multi-times cale optimal scheduling model of "day-intra-day 1 h-intra-day 15 min" was constructed,optimized scheduling of various adjustable resources in the microgrid,and established priority weights for real-time adjustable resources that have a direct impact on users' electricity consumption behavior. Finally,taking an actual microgrid as an example in Fujian,the simulation verifies the validity of the model.
Key words: multi-time scale scheduling;scheduling priority;user evaluation;demand response(DR)resources;microgrid
Classification
Copyright Tianjin Electric Research Institute Co., Ltd Jin ICP Bei No. 07001287 Powered by Handynasty
Online illegal and bad information reporting hotline (Hedong District):022-84376127
Report Mailbox:wangzheng@tried.com.cn