Manuscript details
Current location:Home >Manuscript details
Release date:2023-12-19 Number of views:686 Amount of downloads:579 DOI:10.19457/j.1001-2095.dqcd25127
Abstract: According to the 90 s regular breaking and 15 s emergency breaking requirement for 60 MW axial
compressor used in some large scientific facility,a control strategy of electric hybrid breaking in the convertor was
designed. The hybrid braking control strategy was analyzed and calculated,and the optimal braking control process
for the compressor and the parameters of the braking resistance were determined. The control strategy and breaking time were verified by real-time digital simulator(RTDS)simulation and experiment. The simulation result and experiment result show that simulation result is closed to experiment result,and the hybrid breaking control strategy of convertor is safe and reliable. The real regular breaking time is 87.54 s and the real emergency breaking time is 14.82 s. The regular breaking time and the emergency breaking time fulfil the technical performance.
Key words: axis compressor;convertor;hybrid breaking;control strategy;breaking resistance
Classification
Copyright Tianjin Electric Research Institute Co., Ltd Jin ICP Bei No. 07001287 Powered by Handynasty
Online illegal and bad information reporting hotline (Hedong District):022-84376127
Report Mailbox:wangzheng@tried.com.cn