Abstract: Aiming at the problem of wind abandonment caused by the contradiction between wind and heat
during the winter heating in the Three-north areas of China,a scheduling strategy for electric heating combined
system considering wind power consumption was proposed. Firstly,the "power determined by heat" constraints of
combined heat and power units was decoupled through the heat network interconnection on the source side,and the participation of comprehensive demand response resources was considered on the load side to assist in wind power consumption. Secondly,the multi-time scales scheduling model of the electric heating combined system was
established by considering various constraints,aiming at the lowest total system operation cost in the day before day and the lowest system regulation cost in the real-time stage. Finally,the experimental results of an example show that the proposed scheduling strategy can effectively improve the wind power consumption level and economy of the electric heating combined system.
Key words: heat network interconnection;multi-time scales;demand response(DR);wind power consumption
Classification
Copyright Tianjin Electric Research Institute Co., Ltd Jin ICP Bei No. 07001287 Powered by Handynasty
Online illegal and bad information reporting hotline (Hedong District):022-84376127
Report Mailbox:wangzheng@tried.com.cn