Abstract: Aiming at the problems of regional large-scale photovoltaic construction and access,as well as the
lack of control of existing distributed energy,the construction and operation control method of microgrid group
were put forward,which extracted a three-level and two-stage coordination and interaction system supported by
regional level core area,coordination control unit and multi-type microgrid,and the relevant key technologies were applied and studied. Combined with the actual situation of a certain urban area in Beijing,the actual system
construction was carried out,and the construction of the energy management system of the microgrid group was
completed. The division of coordination control units,the cluster scheduling of distributed energy,the analysis of
microgrid characteristics,the mutual aid between microgrids and other issues were explored,which effectively
improved the elastic space of the active distribution network,and increased the power grid scheduling's ability to
control distributed energy.
Key words: distributed energy;microgrid;coordination control unit;active distribution network;energy
management system
Classification
Copyright Tianjin Electric Research Institute Co., Ltd Jin ICP Bei No. 07001287 Powered by Handynasty
Online illegal and bad information reporting hotline (Hedong District):022-84376127
Report Mailbox:wangzheng@tried.com.cn